GeorgiaSAF
The project

A COMMERCIAL-SCALE
GEORGIA SAF PLATFORM.

CarbonCore has selected Bainbridge and Decatur County as the focus of development for the first GeorgiaSAF commercial production node.

GeorgiaSAF™ | A CarbonCore Company

Planned configuration

TWO TRAINS.
ONE GEORGIA
OPPORTUNITY.

The planned initial configuration comprises two production trains targeting approximately 20,000 barrels per day at full planned capacity.

GeorgiaSAF is being developed as a commercial-scale platform connecting sustainably sourced woody biomass with aviation fuel production. CarbonCore Georgia SAF I LLC is the project company developing the first commercial node.

Capacity is a planning target. The final facility configuration and delivery timetable will depend on technical diligence, engineering, permitting, site assembly and financing.

Site assembly, technical diligence, engineering, permitting, financing and other customary development milestones remain underway.

The planned pathway
  1. GEORGIA FORESTS
  2. BIOMASS
  3. SYNGAS
  4. FISCHER-TROPSCH
  5. SAF
  6. FLIGHT
Location strategy

WHY BAINBRIDGE.

The development focus brings together Southwest Georgia’s forestry economy, industrial setting and access to the Southeast aviation market.

FORESTRY

Southwest Georgia sits within a working-forest region. Feedstock diligence is assessing sourcing, quality, volumes and logistics for the planned facility.

RAIL

Rail forms part of the region’s industrial infrastructure. Project-specific connections, handling requirements, capacity and operator arrangements remain subjects of diligence.

INDUSTRIAL INFRASTRUCTURE

Bainbridge and Decatur County have an established industrial setting. The development process is assessing the land, utilities and infrastructure needed for the planned configuration.

SOUTHEAST AVIATION MARKETS

GeorgiaSAF is being developed with Georgia and Southeast aviation markets in view, including Atlanta. Fuel qualification, transport routes and commercial arrangements remain to be established.

Aerial view of active industrial construction beside an empty railway, surrounded by forest
Development discipline

FROM PLANNING
TO DELIVERY.

Site assembly and the path through to site control remain underway. Technical, regulatory and commercial work must establish the basis for a final investment decision.

PROJECT ENQUIRIES